CCR Rule Compliance Data and Information
Southern Indiana Gas and Electric Company (SIGECO) has established this site for the purpose of posting documentation as required in the EPA's Coal Combustion Residuals rule at 40 CFR Parts 257.105 - 257.107. Beginning on the October 19th, 2015 effective date of the rule, documents will be placed in the operating record as required and subsequently posted to this page within 30 days, or as otherwise required per the compliance deadlines listed in the rule. SIGECO has two generating facilities that are covered by the CCR rule. Information for each site will be listed separately. Please send any inquiries to CCR_Inquiries@centerpointenergy.com.
hidden
hidden
F. B. Culley West Ash Pond Closure
The F.B. Culley West Ash Pond no longer receives coal combustion materials, and has completed closure under the requirements of the Coal Combustion Residuals rule and the Approval of Closure/Post-Closure Plan from IDEM. More information on this project is available at the Indiana Department of Environmental Management Virtual File Cabinet (SW Program ID 87-UP-14).
- A.B. Brown Station
-
hidden
257.107 (e) Location Restrictions
- Brown Ash Pond
257.60 Placement Above the Uppermost Aquifer (PDF)
257.61 Wetlands (PDF)
257.62 Fault Areas (PDF)
257.63 Seismic Impact Zones (PDF)
257.64 Unstable Areas (PDF)
- Brown Landfill
257.64 Unstable Areas (PDF)
- Brown Sedimentation Pond
257.60 Placement Above the Uppermost Aquifer (PDF)
257.61 Wetlands (PDF)
257.62 Fault Areas (PDF)
257.63 Seismic Impact Zones (PDF)
257.64 Unstable Areas (PDF)
257.107 (f) Design Criteria
- 257.107 (f)(1) Design Certification for new CCR Landfill or Surface Impoundment
Documentation to be completed as needed, and posted within 60 days of commencing construction.
- 257.107 (f)(2) Construction Certification for new CCR Landfill or Surface Impoundment
Documentation to be completed as needed, and posted prior to initial receipt of CCR.
- 257.107 (f)(3) Liner Design Certification
- 257.107 (f)(4) Hazard Potential Classification
2021 - Rev 1 | 2021 | 2016
- 257.107 (f)(5) Emergency Action Plan
- 257.107 (f)(6) Annual EAP exercise of face to face meeting
- 257.107 (f)(7) Documentation of EAP Activation
Documentation to be completed as needed
- 257.107 (f)(8) History of Construction for Surface Impoundment
- 257.107 (f)(9) Structural Stability Assessment for Surface Impoundment
- 257.107 (f)(10) Corrective Measures to remedy deficiency or release
Documentation to be completed as needed
- 257.107 (f)(11) Safety Factor Assessment for Surface Impoundment
- 257.107 (f)(12) Design and Construction Plans for new Surface Impoundment
Documentation to be completed as needed, and posted prior to initial receipt of CCR.
257.107 (g) Operating Criteria
- 257.107 (g)(1) Fugitive Dust Control Plan
- 257.107 (g)(2) Annual Fugitive Dust Control Report
- 257.107 (g)(3) Run-on and Run-off Control System Plan for Landfill
A.B. Brown Landfill Run-on Run-off Plan (PDF)
- 257.107 (g)(4) Inflow Design Flood Control System Plan for Surface Impoundment
- A.B. Brown Pond Inflow Design
2021 - Rev 1 | 2021 | 2016
- A.B. Brown Sedimentation Pond Inflow Design
- A.B. Brown Pond Inflow Design
- 257.107 (g)(5) Annual Inspection Report for Surface Impoundment
Brown Ash Pond Inspections (PDF)
- 257.107 (g)(6) Corrective Measures to remedy deficiency noted in inspection report
- 257.107 (g)(7) Annual Inspection Report for Landfill
A.B. Brown Landfill Inspections (PDF)
257.107 (h) Groundwater Monitoring and Corrective Action
- 257.107 (h)(1) Annual GW Monitoring and Corrective Action Report
- 257.107 (h)(2) GW Monitoring System Certification
A.B. Brown Ash Pond GW Monitoring System (PDF)
- 257.107 (h)(3) GW Monitoring Statistical Method Selection
- A.B. Brown Ash Pond GW Monitoring Statistical Certification
- A.B. Brown Landfill GW Monitoring Statistical Certification
- A.B. Brown Sedimentation Pond GW Monitoring Statistical Certification
- 257.107 (h)(4) GW Assessment Monitoring Program
A.B. Brown Ash Pond Notification of GW Assessment Monitoring Program (PDF)
A.B. Brown Landfill Notification of GW Assessment Monitoring Program (PDF)
A.B. Brown Sedimentation Pond Notification of GW Assessment Monitoring Program (PDF)
- 257.107 (h)(5) Return to Detection Monitoring
Notification to be completed within 30 days of returning to detection monitoring
- 257.107 (h)(6) Statistically Significant Level for Appendix IV Parameter
- 257.107 (h)(7) Initiation of Assessment of Corrective Action
Ash Pond Notification of Initiation of Assessment of Corrective Action (PDF)
- 257.107 (h)(8) Completion of Assessment of Corrective Measures
A.B. Brown Ash Pond Corrective Measures Assessment Report (PDF)
A.B. Brown Ash Pond Addendum to Corrective Measures Assessment Report (PDF)
- 257.107 (h)(9) Semiannual Report Describing Progress in Selecting and Designing the Remedy
A.B. Brown Ash Pond Semi-Annual Report - March 2020 (PDF)
A.B. Brown Ash Pond Semi-Annual Report - September 2020 (PDF)
A.B. Brown Ash Pond Semi-Annual Report - March 2021 (PDF)
A.B. Brown Ash Pond Semi-Annual Report - September 2021 (PDF)
A.B. Brown Ash Pond Semi-Annual Report - March 2022 (PDF)
A.B. Brown Ash Pond Semi-Annual Report - September 2022 (PDF)
- 257.107 (h)(10) Completion of Remedy
Documentation to be completed as needed
257.107 (i) Closure and Post Closure Care
- 257.107 (i)(1) Intent to Initiate Closure for Inactive Surface Impoundment
Documentation to be completed by 12/17/2015
- 257.107 (i)(2) Annual Progress Report for Inactive Surface Impoundment Closure
Documentation to be completed within 13 months of initial report, and 12 months of 2nd report
- 257.107 (i)(3) Completion of Inactive Surface Impoundment Closure
Documentation to be completed within 60 days of completing closure
- 257.107 (i)(4) Written Closure Plan
A.B. Brown Pond Closure Plan (PDF)
A.B. Brown Pond Closure Plan – Updated 2020 (PDF)
- 257.107 (i)(5) Demonstration of need for Time Extension to Initiate Closure
Documentation to be completed as needed
- 257.107 (i)(6) Demonstration of need for Time Extension to Complete Closure
Documentation to be completed as needed
- 257.107 (i)(7) Intent to Close CCR Unit
Notification to be completed prior to initiating closure
- 257.107 (i)(8) Completion of CCR Unit Closure
Notification to be completed within 30 days of completing closure
- 257.107 (i)(9) Record of Deed Notation
Notification to be completed within 30 days of notating deed
- 257.107 (i)(10) Intent to Comply with Alternate Closure
Notification to be completed within 6 months of triggering closure
- 257.107 (i)(11) Annual Progress Report under Alternate Closure
Documentation to be completed as needed
- 257.107 (i)(12) Post Closure Plan
- 257.107 (i)(13) Completion of Post Closure Care
Notification to be completed within 60 days of completing post closure
- 257.107 (i)(14) Site Specific Alternative to Initiation of Closure Due to Development of Alternative Capacity Infeasible
Notification of Demonstration Submittal (PDF)
Copy of Demonstration (PDF)
Completeness Letter (PDF)
Response to U.S. EPA February 2022 Request for Additional Information (PDF)
- 257.107 (i)(15) Proposed Determination - Conditional Approval for Site-Specific Alternative to Initiation of Closure
A.B. Brown Ash Pond Proposed Determination - 10-5-2022 (PDF)
257.107 (j) Retrofit Criteria
Documentation to be completed as needed
- Brown Ash Pond
- F.B. Culley Station
-
The labels "EAST" and "WEST" in the lists below refer to the East Ash Pond and West Ash Pond, respectively.
West Ash Pond: On July 26, 2016, EPA released the CCR Extensions Rule to address the vacature of 40 CFR § 257.100 which established expemptions for Inactive CCR Surface Impoundments. Units that had declared Inactive status by 12/17/15 under 257.100 (i)(1) must comply with amended deadlines as listed in the Extensions rule.
257.107 (e) Location Restrictions
-
- EAST:
257.60 Placement Above the Uppermost Aquifer (PDF)
257.61 Wetlands (PDF)
257.62 Fault Areas (PDF)
257.63 Seismic Impact Zones (PDF)
257.64 Unstable Areas (PDF)
- WEST:
257.60 Placement Above the Uppermost Aquifer (PDF)
257.61 Wetlands (PDF)
257.62 Fault Areas (PDF)
257.63 Seismic Impact Zones (PDF)
257.64 Unstable Areas (PDF)
- EAST:
257.107 (f) Design Criteria
- 257.107 (f)(1) Design Certification for new CCR Landfill or Surface Impoundment
- EAST: Documentation to be completed as needed, and posted within 60 days of commencing construction.
- WEST: Documentation to be completed as needed, and posted within 60 days of commencing construction.
- 257.107 (f)(2) Construction Certification for new CCR Landfill or Surface Impoundment
- EAST: Documentation to be completed as needed, and posted prior to initial receipt of CCR.
- WEST: Documentation to be completed as needed, and posted prior to initial receipt of CCR.
- 257.107 (f)(3) Liner Design Certification
- EAST: F.B. Culley East Liner Design (PDF)
- WEST: F.B. Culley West Liner Design (PDF)
- 257.107 (f)(4) Hazard Potential Classification
- EAST:
F.B. Culley East Hazard Potential Classification (PDF)
2021 - Rev 1 | 2021 | 2016
- WEST: F.B. Culley West Hazard Potential Classification (PDF)
- EAST:
F.B. Culley East Hazard Potential Classification (PDF)
- 257.107 (f)(5) Emergency Action Plan
- EAST: F.B. Culley East Emergency Action Plan (PDF)
- WEST: F.B. Culley West Emergency Action Plan (PDF)
- 257.107 (f)(6) Annual EAP exercise of face to face meeting
- 257.107 (f)(7) Documentation of EAP Activation
- EAST: Documentation to be completed as needed
- WEST: Documentation to be completed as needed
- 257.107 (f)(8) History of Construction for Surface Impoundment
- EAST: F.B. Culley East History of Construction (PDF)
- WEST: F.B. Culley West History of Construction (PDF)
- 257.107 (f)(9) Structural Stability Assessment for Surface Impoundment
- EAST: F.B. Culley East Structural Stability Assessment
- WEST: F.B. Culley West Structural Stability Assessment (PDF)
- 257.107 (f)(10) Corrective Measures to remedy deficiency or release
- EAST: Documentation to be completed as needed
- WEST: Documentation to be completed as needed
- 257.107 (f)(11) Safety Factor Assessment for Surface Impoundment
- EAST: F.B. Culley West Safety Factor Assessment
2021 - Rev 1 | 2021 | 2016 (PDF - 30MB)
- WEST: F.B. Culley West Safety Factor Assessment (PDF)
- EAST: F.B. Culley West Safety Factor Assessment
- 257.107 (f)(12) Design and Construction Plans for new Surface Impoundment
- EAST: Documentation to be completed as needed, and posted prior to initial receipt of CCR.
- WEST: Documentation to be completed as needed, and posted prior to initial receipt of CCR.
257.107 (g) Operating Criteria
- 257.107 (g)(1) Fugitive Dust Control Plan
- EAST: F.B. Culley East Dust Control Plan (PDF)
- WEST: F.B. Culley West Dust Control Plan (PDF)
- 257.107 (g)(2) Annual Fugitive Dust Control Report
- 257.107 (g)(3) Run-on and Run-off Control System Plan for Landfill
Not applicable
- 257.107 (g)(4) Inflow Design Flood Control System Plan for Surface Impoundment
- EAST: F.B. Culley East Inflow Design (PDF)
2021 - Rev 1 | 2021 | 2017 | 2016
- WEST: F.B. Culley West Inflow Design (PDF)
- EAST: F.B. Culley East Inflow Design (PDF)
- 257.107 (g)(5) Annual Inspection Report for Surface Impoundment
- 257.107 (g)(6) Corrective Measures to remedy deficiency noted in inspection report
- 257.107 (h)(1) Annual GW Monitoring and Corrective Action Report
- 257.107 (h)(2) GW Monitoring System Certification
- EAST: F.B. Culley East Ash Pond GW Monitoring System (PDF)
- WEST: F.B. Culley West Ash Pond GW Monitoring System (PDF)
- 257.107 (h)(3) GW Monitoring Statistical Method Selection
- EAST: F.B. Culley East Ash Pond GW Monitoring Statistical Certification (PDF)
- WEST: F.B. Culley West Ash Pond GW Monitoring Statistical Certification (PDF)
- 257.107 (h)(4) GW Assessment Monitoring Program
- 257.107 (h)(5) Return to Detection Monitoring
- EAST: Notification to be completed within 30 days of returning to detection monitoring
- WEST: Notification to be completed within 30 days of returning to detection monitoring
- 257.107 (h)(6) Statistically Significant Level for Appendix IV Parameter
- EAST: Notification of SSL (PDF)
- WEST: Notification of SSL (PDF)
- 257.107 (h)(7) Initiation of Assessment of Corrective Action
- 257.107 (h)(8) Completion of Assessment of Corrective Measures
- WEST:
Culley West Ash Pond Corrective Measures Assessment Report (PDF)
- 257.107 (h)(9) Semiannual Report Describing Progress in Selecting and Designing the Remedy
- EAST:
F.B. Culley East Ash Pond Semi-Annual Report - March 2020 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - September 2020 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - March 2021 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - September 2021 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - March 2022 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - September 2022 (PDF)
F.B. Culley East Ash Pond Semi-Annual Report - March 2023 (PDF)
- WEST:
F.B. Culley West Ash Pond Semi-Annual Report - August 2021 (PDF)
F.B. Culley West Ash Pond Semi-Annual Report - February 2022 (PDF)
F.B. Culley West Ash Pond Semi-Annual Report - August 2022 (PDF)
F.B. Culley West Ash Pond Semi-Annual Report - February 2023 (PDF)
- EAST:
- 257.107 (h)(10) Completion of Remedy
- EAST: Documentation to be completed as needed
- WEST: Documentation to be completed as needed
257.107 (h) Groundwater Monitoring and Corrective Action
257.107 (i) Closure and Post Closure Care
- 257.107 (i)(1) Intent to Initiate Closure for Inactive Surface Impoundment
- EAST: Not applicable
- WEST: FB Culley West NOI (PDF)
- 257.107 (i)(2) Annual Progress Report for Inactive Surface Impoundment Closure
- EAST: Not applicable; Inactive category withdrawn by EPA
- WEST: Not applicable; Inactive category withdrawn by EPA
- 257.107 (i)(3) Completion of Inactive Surface Impoundment Closure
- EAST: Not applicable; Inactive category withdrawn by EPA
- WEST: Not applicable; Inactive category withdrawn by EPA
- 257.107 (i)(4) Written Closure Plan
- EAST: F.B. Culley East Closure Plan
- WEST: F.B. Culley West Closure Plan (PDF)
- 257.107 (i)(5) Demonstration of need for Time Extension to Initiate Closure
- EAST: Documentation to be completed as needed
- WEST: Documentation to be completed as needed
- 257.107 (i)(6) Demonstration of need for Time Extension to Complete Closure
- EAST: Documentation to be completed as needed
- WEST: Documentation to be completed as needed
- 257.107 (i)(7) Intent to Close CCR Unit
- EAST: FB Culley East NOI (PDF)
- WEST: Not Applicable
- 257.107 (i)(8) Completion of CCR Unit Closure
- EAST: Notification to be completed within 30 days of completing closure
- WEST: Notification of Completion of Closure (PDF)
- 257.107 (i)(9) Record of Deed Notation
- EAST: Notification to be completed within 30 days of notating deed
- WEST: Environmental Restrictive Covenant (PDF)
- 257.107 (i)(10) Intent to Comply with Alternate Closure
- EAST: Notification to be completed within 6 months of triggering closure
- WEST: Notification to be completed within 6 months of triggering closure
- 257.107 (i)(11) Annual Progress Report under Alternate Closure
- EAST: Documentation to be completed as needed
- WEST: Documentation to be completed as needed
- 257.107 (i)(12) Post Closure Plan
- EAST: F.B. Culley East Post Closure Plan (PDF)
- WEST: F.B. Culley West Post Closure Plan (PDF)
- 257.107 (i)(13) Completion of Post Closure Care
- EAST: Notification to be completed within 60 days of completing post closure
- WEST: Notification to be completed within 60 days of completing post closure
- 257.107 (i)(14) Site Specific Alternative to Initiation of Closure Due to Development of Alternative Capacity Infeasible
- EAST:
Copy of Demonstration (PDF)
- WEST: Not Applicable
Completeness Letter (PDF)
Response to U.S. EPA February 2022 Request for Additional Information (PDF)
Schedule Update - February 2023 (PDF)
257.107 (j) Retrofit Criteria
-
- EAST: Documentation to be completed as needed
- WEST: Documentation to be completed as needed
-